| 
                S.No | 
            
                Paper Title | 
            
                Author's | 
            
                View/Download | 
        
        
            | 
                1. | 
            
                A 1D-2D Coupled La ttice Boltzmann Model for Shallow Wa ter 
				Simulations in Large Scale River-Lake Systems | 
            
                J. Y. Wua, A. Q. Lia and L. M. Zhanga | 
            
                
				  | 
        
        
            | 
                2. | 
            
                Development of Cascade Hydropower Project in Nam Ou River Basin 
				in Laos along Belt & Road by Power china | 
            
                Zhang Guolai and Luo Mingqing | 
            
        
    			
				  | 
        
        
            | 
                3. | 
            
                Analytical study of sediment yield characteristics of Tehri 
				catchment in upper Himalayas | 
            
                Dhirendra Veer Singh, R.K. Vishnoi, T.S. Routela and A.K. 
				Badoni | 
            
        
    			
				  | 
        
        
            | 
                4. | 
            
                Rehabilitation of Gaulwerk Hydropower Plant Considering 
				Environment, Sediment Management And Flood Protection | 
            
                C. Auel, E. Gruber, F. Kircher, R. Fritzer, C. Moritz and T. 
				Huber | 
            
        
    			
				  | 
        
        
            | 
                5. | 
            
                Cascading Hydropower Projects on Teesta River Basin | 
            
                Mrs. S. R. Patnaik, Mrs. V.P. 
				Gadhe, B.S. Sundarlal, 
				Dr. M.R. Bhajantri and Dr. 
				(Mrs.) V.V. Bhosekar | 
            
        
    			
				  | 
        
        
            | 
                6. | 
            
                An integrated approach for circular sediment management (CSM ) 
				in reservoirs | 
            
        	A. Omer, S. Giri, J. Kamphuis, K. Meerse and J. Wijnands, H. 
			Ekkelenka mp and E. Besseling | 
            
        
    			
				  | 
        
        
            | 
                7. | 
            
                Dam Break Accident and Resulting Sediment Management at 
				Downstream Dams in Lao PDR - Highly Turbid Flood-Flow and 
				Sediment Flushing at Nan Ngiep 1 Hydropower Project  | 
            
                T. Tabuchi, Y. Aosaka & Y. Murakami and S. Tsutsui | 
            
        
    			
				  | 
        
        
            | 
                8. | 
            
                Evaluating methods for Estimating Evaporation in Major Re 
				servoirs - Srisailam Project | 
            
                S. Narasimha Rao, V. Raghunath Sharma and M.K.Krishnan | 
            
        
    			
				  | 
        
        
            | 
                9. | 
            
                One Percent Annual Chance Flood Risk-Solutions To Communication 
				And Technical Challenges Involving Levees And Dams | 
            
                Doug Bellomo | 
            
        
    			
				  | 
        
        
            | 
                10. | 
            
                Damodar basin water management system - A review on critical 
				issues and performance | 
            
                Satyabrata Banerjee | 
            
        
    			
				  | 
        
        
            | 
                11. | 
            
                Development of Real Time Data Acquisition System (RTDAS ) and 
				Real 
				Time Decision Support System (RTDSS ) for Damodar River Basin 
			 | 
            
        	Nasim Ansari | 
            
        
    			
				  | 
        
        
            | 
                12. | 
            
                Flood Management at Kamala Dam | 
            
                A. Mehta, D.V. Thareja and V. Batta | 
            
        
    			
    			  | 
        
        
            | 
                13. | 
            
                Sediment Management in Hydroelectric Projects by Op erating 
				Reservoirs for Desilting | 
            
                H. Chaudhary, S.B. Tayade, S.A. Kamble and Neena Isaac | 
            
        
    			
				  | 
        
        
            | 
                14. | 
            
                Sustainable Integrated River Basin Management of Upper Wardha 
				Project, India : A Case Study | 
            
                V. D. Loliyana, B. Khapre and Ashok Karva | 
            
        
    			
				  | 
        
        
            | 
                15. | 
            
                Sedimentation management oF Patrind Hydro Power Project Using 
				Ohds Technique | 
            
                Woncheol Park, Seongyong HAN, Yeonju LEE 
				and Kyoungmin PARK | 
            
        
    			
				  | 
        
        
            | 
                16. | 
            
                River Basin Rehabilitation and Management : Biodiversity offset 
				in South Africa | 
            
                J. Nyakale And K. Naidoo | 
            
        
    			
				  | 
        
        
            | 
                17. | 
            
                Optimization of the Water Management in the Veľká Domaša 
				Reservoir | 
            
                E. Bednarova, J. Skvarka, R. Ivanco, M. Miscik and B. Liptak | 
            
        
    			
				  | 
        
        
            | 
                18. | 
            
                Optimizing the Design and Layout of Spillways and Energy 
				Dissipators for Cascade Hydropower Projects in Ravi Basin, India | 
            
                R.R. Bhate, Dr. M. R. Bhajantri and Dr. (Mrs.) V. V. 
				Bhosekar | 
            
        
    			
				  | 
        
        
            | 
                19. | 
            
                Water Conflict Caused by Dam Construction in the Transboundary 
				River in Korea | 
            
                Suk Hw an Jang, Jae Kyoung Lee and Jun Won Jo | 
            
        
    			
				  | 
        
        
            | 
                20. | 
            
                Casupá Dam and Reservoir: Sustainable Water Supply for the 
				Montevideo Metropolitan Area | 
            
                M. Pintos, D. Bellón, L. Loureiro, A. Santa, L. Cabrera, R. 
				López and M. G. Membrillera | 
            
        
    			
				  | 
        
        
            | 
                21. | 
            
                Effective reservoir operation for flood control based on 
				rainfallrunoff- 
				inundation analysis considering extreme events in the Katsura 
				River basin, Japan | 
            
                M. Iwamoto, T. Koshiba D. Nohara, Y. Take mon and T. Sumi | 
            
        
    			
				  | 
        
        
            | 
                22. | 
            
                Evaluation of Optimization Models for Re servoir Operation : 
				from Rule-Curve to Many-Objective Operation | 
            
                Duan Chen | 
            
        
    			
				  | 
        
        
            | 
                23. | 
            
                Flood Retention Dams for Controlling Flash Floods in Oman | 
            
                R. Haselsteiner, B. Er soy and N. Jaber | 
            
        
    			
				  | 
        
        
            | 
                24. | 
            
                Flood control measures in the Lower Rhine basin | 
            
                C. Ingenhoff and R. Haselsteiner | 
            
        
    			
				  | 
        
        
            | 
                25. | 
            
                Integrated Basin Development of Damodar Valley – DVC and Lower 
				Damodar | 
            
                Siba Prasad Sen | 
            
        
    			
				  | 
        
        
            | 
                26. | 
            
                Investigation of Sedimentation in the Three Gorges Reservoir, 
				China | 
            
                Z.W. Jin, J.Y Lu, H. Wu,  Q.L Li, Y.K. Guo and B. John | 
            
        
    			
				  | 
        
        
            | 
                27. | 
            
                Kaleshwaram Project – A Growth Engine for Integrated Godavari 
				Basin Development Plan | 
            
                Nalla Venkateshwarlu and Sridhar Rao Deshpande | 
            
        
    			
				  | 
        
        
            | 
                28. | 
            
                Forecasting Hydropower Generation Using Artificial Neural 
				Networks and the Effect of Various Environmental Factors for the 
				Optimal Operation of Spillway Gates | 
            
                Kemoh Lumei | 
            
        
    			
				  | 
        
        
            | 
                29. | 
            
                Construction and reservoir operation of Obudu Dam in Cross River 
				Basin Development Authority, Nigeria | 
            
                Imo Ekpo, B. Nkposong and N. Agbiji | 
            
        
    			
				  | 
        
        
            | 
                30. | 
            
                Evolving Institutional Setup For Integrated River Basin 
				Management 
				in Kerala 
			 | 
            
        
    			Sudhee r Padikk al, Joshy KA and Soumya R Chandran | 
            
        
    			
				  | 
        
        
            | 
                31. | 
            
                
				Importance of Multiple Time Step Optimization in River Basin 
				Planning and Management  
				the Case Study of Narmada & Damodar River Basin    
			 | 
            
        
    			Nesa Ilich, Neeraj Manglik and Ashoke Basistha | 
            
        
    			
				  | 
        
        
            | 
                32. | 
            
                Impact Evaluation of A Proposed Water Supply Reservoir 
			 | 
            
        
    			C. O’Nei ll | 
            
        
    			
				  | 
        
        
            | 
                33. | 
            
                Importance of Dam Operation For Downstream River Health 
			 | 
            
        
    			Vivek P. Kapadia | 
            
        
    			
				  | 
        
        
        
            | 
                34. | 
            
                Numerical Model Simulations for Sedimentation in 
				Run-of-the-River 
				Projects | 
            
                P.S. Kunjeer, S.B. Tayade, H.P. Chaudhary and Neena Isaac | 
            
        
    			
				  | 
        
        
            | 
                35. | 
            
                Scenario Analysis of Reservoir Operation : A Case Study of Mugu 
				Karnali Storage Hydroelectric Project, Nepal | 
            
                K. R. Regmi, M. P. Acharya, D. Acharya, S. Maharjan and A. 
				KC | 
            
        
    			
				  | 
        
        
            | 
                36. | 
            
                The Controlling Accelerat ion of Wat ershed Damage and Wat er 
				Quality in Cita rum River on The Performance IR . H. Djuanda Da 
				m | 
            
                Anom S. Herudjito, Diah Kusumaningrum and Yudi Setiawan | 
            
        
    			
				  | 
        
        
            | 
                37. | 
            
                The advance in the ecological regulation practice of Three 
				Gorgers Reservoir, China  | 
            
        
    			Xingya Xu and Yan Huang | 
            
        
    			
				  | 
        
        
            | 
                38. | 
            
                Operation of Spillway Gates of Multipurpos e Dam Reservoirs 
				During Floods | 
            
                Dr M R Goyal | 
            
        
    			
				  | 
        
        
            | 
                39. | 
            
                Strategy on Reservoir Regulation Based on Safety of Arch Dam 
			 | 
            
        
    			G.Q. Chen and Y.P. Mao | 
            
        
    			
				  | 
        
        
            | 
                40. | 
            
                Study on the joint operation scheme of Nierji and Fenman 
				reservoirs in 
				Songhua river basin 
			 | 
            
        
    			Li Jinxiang and Wang Xiaoni | 
            
        
    			
				  | 
        
        
            | 
                41. | 
            
                Application and Research of Hydropower Station Operation 
				Scheduling Char t Based on Parallel Normal Cloud Mutation 
				Shuffled Frog 
				Leaping Algorithm | 
            
                Ping Sun, Fei Ca o, Na Zhang and Tingting Wa ng | 
            
        
    			
				  | 
        
        
            | 
                42. | 
            
                Dealing suspended sediment for optimal operation of hydro 
				projects 
			 | 
            
        
    			M.K. Verma | 
            
        
    			
				  | 
        
        
            | 
                43. | 
            
                Intervention in Existing Spillway Gates by providing flap type 
				Radial gate to 
				negotiate Floating Trash | 
            
        
    		V K Maini, S P Mukherjee and Suveer Pandey | 
            
        
    			
				  | 
        
        
            | 
                44. | 
            
                
				key technologies for efficient development and utilization of 
				water power in Dadu River basin | 
            
        	 
			Bin  Duan 
			 | 
            
        
    			
				  | 
        
        
            | 
                45. | 
            
                Three Large Reservoirs Operation in The Cascade System Citarum 
				River -  Indonesia | 
            
        	
			Reni Mayasari | 
            
        
    			
				  | 
        
        
            | 
                46. | 
            
                
				Study on the ability of maintaining the long-term live storage 
				capacity of sandy river reservoir | 
            
        	Zhao  Jinqiong | 
            
        
    			
				  | 
        
        
            | 
                47. | 
            
                SEDIMENT YIELD AND DEPOSTION PATTERN IN LONGCONICAL TEHRI 
				RESERVOIR. | 
            
        
    		Dhirendra Veer Singh , R.K. Vishnoi , T.S. Routela , A.K. Badoni
 | 
            
        
    			
				  |