| 
                S.No | 
            
                Paper Title | 
            
                Author's | 
            
                View/Download | 
        
        
            | 
                1. | 
            
                Rehabilitation works for Isalnitagated dam | 
            
        
    			D. Stematiu | 
            
                
				  | 
        
        
            | 
                2. | 
            
                Seepage control in Masonry Dams with Modern Technology using 
				Innovative Techniques and Execution Methodologies : Case Study : 
				The Bhavanisagar dam, Tamil Nadu, India | 
            
        
    			R.Suresh Balaji and G. Chandramoulie | 
            
        
    			
				  | 
        
        
            | 
                3. | 
            
                Using Earth Pressure Instrument Data to Examine the Safety of 
				Earth Dams against Arching and Shear Failure | 
            
                Fardin Jafarzadeh, Amir Akbari Garakani and Jafar Maleki | 
            
        
    			
    			  | 
        
        
            | 
                4. | 
            
                Dam Rehabilitation and Safety Improvement Project in Vietnam | 
            
        
    			L. Spasic-Gril and Dr. T. Sy Ho | 
            
        
    			
				  | 
        
        
            | 
                5. | 
            
                Malter Dam – Innovative Extension of Service-Spillway Using A 
				Novel Vertical Flow Separator | 
            
                H. Haufe | 
            
        
    			
				  | 
        
        
            | 
                6. | 
            
                Impervious Asphalt Membranes for Aging Concrete Dams | 
            
        
    			Yue Zhu Shan Feng Weibiao Wang | 
            
        
    			
				  | 
        
        
            | 
                7. | 
            
                Assessment of Concrete Properties of Bhakra Dam in India | 
            
        
    		Brijesh Singh, V V Arora, P N Ojha, B N Mohapatra , Vikas Patel and 
			Pramod Narayan and Bikram K Patra | 
            
        
    			
				  | 
        
        
            | 
                8. | 
            
                Cahora Bassa Dam. Stoplog Operation and Regulating Gates 
				Instrumentation | 
            
        
    			J.F. Melo, E.F. Carvalho, C. Malauene, I. Meireles and P. 
				Pinotes | 
            
        
    			
				  | 
        
        
            | 
                9. | 
            
                Experimental Study on The Energy Dissipation of Jets Collision 
				And Rainfall Intensity Along The Side Slopes | 
            
        
    			Jingjing ZHAI, Qingyuan YANG, Yonghong WENG , Qiuxiu CAO and 
				Yingkui WANG | 
            
        
    			
				  | 
        
        
            | 
                10. | 
            
                Experimental study on curtain reinforcement grouting for dam 
				foundation of Miaowei Hydro -power Station | 
            
        
    			Jiang Zhian, Xie W u, Xiao Enshang, Tang Yushu 
				and Sun Liang | 
            
        
    			
				  | 
        
        
            | 
                11. | 
            
                Heightening of Dhanikhari dam -Hydraulic Design of Spillway and 
				Energy Dissipator | 
            
        
    			V.S. Ramarao, M.R. Bhajantri and V.V. Bhosekar | 
            
        
    			
				  | 
        
        
            | 
                12. | 
            
                An Extraordinary Event at the Mariborski Otok Dam 
			 | 
            
        	P.Zvanut | 
            
        
    			
				  | 
        
        
            | 
                13. | 
            
                Seepage Control in Masonry Gravity Dams through Dam Body 
				Grouting - A Case Study | 
            
        
    			R.Vigneswaran, Rizwan Ali, S.J. Pillai, Sarbjeet Singh, K. 
				Balachandran, Jai Prakash Meena and Ankit Sahu | 
            
        
    			
				  | 
        
        
            | 
                14. | 
            
                Assessment of Seepage Through Subsoil of Hidkal Da m, Ka rnataka 
				and Remedial Measures | 
            
        
    			Dr. Sa njay A. Burele, G. C. Singarkar, Dr. Pravuram Panda and 
				K.A.M. Bagwan | 
            
        
    			
				  | 
        
        
            | 
                15. | 
            
                Seismic Tomography for Internal Condition Investigation and 
				Assessment of Quantity of Grouting for Concrete and Masonry Dams | 
            
        
    			Ashutosh Kaushik and Sanjay Rana | 
            
        
    			
				  | 
        
        
            | 
                16. | 
            
                Safety Inspection of Dams in India | 
            
        
    			Gulshan Raj, Rajeev Singhal and Vi vek Kumar Soni | 
            
        
    			
				  | 
        
        
            | 
                17. | 
            
                The Video-Sonar Integrated Method for Leakage Detection and its 
				Application | 
            
        
    			Yi Xu, Xiaoming Zhou and Jinzhang Tian | 
            
        
    			
				  | 
        
        
            | 
                18. | 
            
                Underwater Leakage Detection and Rehabilitation for Concrete 
				Faced 
				Rockfill Dams | 
            
        
    			Jianhua Lu, Yi Xu, Xiaoming Zhou And Jinzhang Tian | 
            
        
    			
				  | 
        
        
            | 
                19. | 
            
                Hydraulic Model Studies for Optimizing Layout Of Power Intakes 
				in Run-of-The-River Projects | 
            
        
    			P D Patil, F D Momin, P S Kunjeer and Neena Isaac | 
            
        
    			
				  | 
        
        
            | 
                20. | 
            
                Long Term Structural Performance Monitoring of Gravity Dams 
				Through 
				Analysis and Interpretation of Inst rumentation Data –A case 
				study | 
            
        
    			M.S. Hanumanthapp a, Rizwan Al i, Shyamli Paswan, Shabeer A Lone 
				and Vishnu K Meena | 
            
        
    			
				  | 
        
        
            | 
                21. | 
            
                Performance of Dam and Foundation System - Case Study of 
				Concrete Gravity Dam of Srinagar Hydroelectric Project, India | 
            
                Rakesh Khali and Naveen K Bahuguna | 
            
        
    			
				  | 
        
        
            | 
                22. | 
            
                The Rehabilitation of Levees with Large Trees by Equivalent 
				Static 
				Systems | 
            
        
    			R. Haselsteiner and D. Kerres | 
            
        
    			
				  | 
        
        
            | 
                23. | 
            
                Role of Institutional Strengthening for Sustained Dam Safety 
				Management | 
            
        
    			Pramod Narayan and M. Bhaskara Reddy | 
            
        
    			
				  | 
        
        
            | 
                24. | 
            
                Rehabilitation using special resin mortars for large hydraulic 
				Structures | 
            
                Sachin Chugh and Pushpam Kumar | 
            
        
    			
				  | 
        
        
            | 
                25. | 
            
                Storm Analysis And Quasi Distributed Hydrologigal Modelling For 
				Design Flood Review of Ukai Da m, GujArat 
			 | 
            
        
    			N.K. Mathur, C. Lal, N.N. Rai and Isly Issac | 
            
        
    			
				  | 
        
        
            | 
                26. | 
            
                Addressing sediment-induced problems under the Dam 
				Rehabilitation and Improvement Project in India | 
            
        
    			S. Giri, D. C. Froehlich and P. Narayan 
 and B. Pa tra | 
            
        
    			
				  | 
        
        
            | 
                27. | 
            
                Comprehensive Foundation Treatments of Jinping I Arch Dam and 
				Its Working State During Initial Impoundment | 
            
        
    			Shaohui Duan, Rui Wang, Manbin Shen, Jialu Wang, Lijun Xue | 
            
        
    			
				  | 
        
        
            | 
                28. | 
            
                A Measure of Dam Safety of Existing Multi-Purpose Dam In Korea | 
            
        
    			Tae Ho Kang, Jong Beom Park, Ta e Hwan Lim and Hye Jin Park | 
            
        
    			
				  | 
        
        
            | 
                29. | 
            
                Case Study On Underwater Inspection Method for Tailrace Area In 
				Hydropower Stations | 
            
        
    			Xie Huaidong, Cai Wei, Chen Zhenghu, Zhu Yi gang and Zhou Zhou | 
            
        
    			
				  | 
        
        
            | 
                30. | 
            
                Appliying Early Concrete Compressive Strength Prediction In 
				Infrastructure Construction; Case Study | 
            
        
    			S.R.Daregholi and H.Hosseinzadeh | 
            
        
    			
				  | 
        
        
            | 
                31. | 
            
                Early Prediction of RCC Dam Body Permeability during 
				Construction - 
				Case Study: Dyraaba Dam, Sri Lanka | 
            
        
    			H.Hosseinzadeh and S.R.Daregholi | 
            
        
    			
				  | 
        
        
            | 
                32. | 
            
                Evaluation of the permitted risk level for aged dams during 
				survey and 
				expertise | 
            
        
    			M.A. Goncharov and E.A. Goncharov | 
            
        
    			
				  | 
        
        
            | 
                33. | 
            
                Dam Repair System | 
            
        
    			Pasquale ZAFFARONI and Simone BARILE | 
            
        
    			
				  | 
        
        
            | 
                34. | 
            
                Application of Intelligent Technology in Flood Discharge 
				Facilities of 
				Xiluodu Hydropower Plant | 
            
        
    			L.H. Yu & Q.W. Xi & Y. Wu & X.B. Fa n and Y.P. Mao | 
            
        
    			
				  | 
        
        
            | 
                35. | 
            
                Future Challenges in Design of Spillways and Energy Dissipators | 
            
                R.R.Bhate, Dr. M. R. Bhajantri and Dr. (Mrs.) V. V. Bhosekar | 
            
        
    			
				  | 
        
        
            | 
                36. | 
            
                Innovative Methodology to Control Seepage of Pathazhakkundu 
				Earthen Dam in Kerala, India | 
            
                Dr. P.T. Santhosh Kumar, K.A. Joshy and Sowmya Chandran | 
            
        
    			
				  | 
        
        
            | 
                37. | 
            
                Restoration and Rehabilitation of Spillway with Modified Energy 
				Dissipator-A case study | 
            
                Amit Kulhare, Mrs. S.R. Patnaik, Dr . M.R. Bhajantri and Dr . 
				(Mrs.) V.V. Bhosekar | 
            
        
    			
				  | 
        
        
            | 
                38. | 
            
                Study of Computational Fluid Dynamics Analysis with Design on 
				the Spillway of Hydroelectric Power Plant | 
            
        
    			M. Masuda, F. Watanabe and S. Takano | 
            
        
    			
				  | 
        
        
            | 
                39. | 
            
                Long-term Monitoring of Sub-Surface Change in Earth Embankment 
				Dams | 
            
        
    			J.E. Chambers, P. Meld rum, P. Wilkinson, D. Gunn, C. Goff and 
				N. Slater | 
            
        
    			
				  | 
        
        
            | 
                40. | 
            
                Rehabilitation and Prevention of Frost Damage To Thin Concrete 
				Dams in Cold Regions | 
            
        
    			M. Rosenqvist, M. Hassanzadeh, K. Fridh and C.-O. Nilsson | 
            
        
    			
				  | 
        
        
            | 
                41. | 
            
                Prototype Observations and Numerical Modelling of Geysers from A 
				Bottom Outlet | 
            
        
    			J. Yang, P.H. Teng, S.C. Li, F. Midböe, M. Bergman and L. Ormann | 
            
        
    			
				  | 
        
        
            | 
                42. | 
            
                Risk-based Stability Evaluation of the Upper Spillway Middle 
				Pier – Isimba HEPP Uganda | 
            
        
    			D.E Mukwanason, W. Manirakiza, M. Akurut, J. Sempewo, M. Kayondo 
				and H.E. Mutikanga | 
            
        
    			
				  | 
        
        
            | 
                43. | 
            
                Innovative Remedial Design of Barrel Arch Dam | 
            
        
    			Richard Millet, Rekha Nanduri , Nagesh Malyala and Juan Vargas | 
            
        
    			
				  | 
        
        
            | 
                44. | 
            
                An Introduction to Structural Evaluation of Dam Appurtenant 
				Structures : Spillways and Radial Gates | 
            
        
    			Vee raja Ma lyala, Adit Joshi, Brad Zelonis and Ti mothy 
				King | 
            
        
    			
				  | 
        
        
            | 
                45. | 
            
                Geotechnical Characterization of Cement Bentonite Mixture for 
				Seepage Cutoff Walls In Ituango Dam | 
            
        
    			Z. Zapata, M.C. Sierra, L.F. Restrepo and J.E. Múnera | 
            
        
    			
				  | 
        
        
            | 
                46. | 
            
                Mosul Dam – A Multi-National Dam Found ation Rehabilitation 
				Effort | 
            
        
    			Juan Vargas, David Sawitzki, Nagesh Malyala and Raffaella 
				Granata | 
            
        
    			
				  | 
        
        
            | 
                47. | 
            
                Modernization, Optimization and Rehabilitation of Ageing Dams | 
            
        
    			T. Srinivas, K.S.S.Chandra Sekhar and S. Srinivasulu | 
            
        
    			
				  | 
        
        
            | 
                48. | 
            
                Significance of Stress-Sensitivity Analyses and Monitoring of 
				Structural Behavior of Concrete Double Curvature Arch Dams Using 
				Finite Element Modelling for the Safety Evaluation of Existing 
				Dams | 
            
        
    			JIJI PANICKER K, PRAVEEN NAGARAJAN and SANTO SH G.THAMPI
				
			 | 
            
        
    			
				  | 
        
        
            | 
                49. | 
            
                An Overview on Seepage Investigation during Impounding by 
				Instrumentation Data – a Case Study | 
            
        
    			A. Hafezquran, GH. Deravi and A. Moshirpanahi | 
            
        
    			
				  | 
        
        
            | 
                50. | 
            
                Innovative Seepage and Spillway Remedial Designs of A Puddle 
				Clay 
				Core Dam | 
            
        
    			E.A. Toms, H. Forsling and C. Wi nckler | 
            
        
    			
				  | 
        
        
            | 
                51. | 
            
                Strategy for Rehabilitation and Strengthening of Dam - A Case 
				Study 
				of Temghar Dam | 
            
        
    			R. D. Mohite, P.S. Kolhe and S.V. Pradaks hine | 
            
        
    			
				  | 
        
        
            | 
                52. | 
            
                Requisite of Geotechnical Evaluation for Ag e Old Dams and 
				Appurtenant Structures to Enhance the Existing Health Status for 
				Their Longevity – A Case Study of Selected Dams in Tamil Nadu | 
            
        
    			K. Jayabalan and K. Aravind | 
            
        
    			
				  | 
        
        
            | 
                53. | 
            
                Securement of Safety and Enhancement of Value for the Aged Dams 
				in South Korea | 
            
        
    			Seunghee Do, Jinseob YOON, Raechang PARK and Insik LEE | 
            
        
    			
				  | 
        
        
            | 
                54. | 
            
                Evolving Repair Methodologies for Spillways and Stilling Basin 
				in 
				Himalayan Region | 
            
        
    			Balraj Joshi, Keshav De shmukh, Ajay Mittal and 
				Shrish Dubey | 
            
        
    			
				  | 
        
        
            | 
                55. | 
            
                Unmanned Maintenance Work with Underwater Remotely Operated 
				Vehicle (ROV) for Discharge Facilities of Dams | 
            
        
    			S. Uchida and M. Kaida | 
            
        
    			
				  | 
        
        
            | 
                56. | 
            
                Indian Experience in Flexible Geomembrane for Water tightness of 
				Ageing Dams | 
            
        
    			Vinayagam Subramanian, Jagadeesan Subramanian, Alberto M 
				Scuero and Gabriella Vaschetti | 
            
        
    			
				  | 
        
        
            | 
                57. | 
            
                Inspection of Dam Infrastructures using ROVs - An Innovative 
				Approach | 
            
        
    			Kannappa Palaniappan P, Johns T Mathai, Ni rmal Thomas and 
				Sudheesh K | 
            
        
    			
				  | 
        
        
            | 
                58. | 
            
                Hydraulic Model Studies for Additional Spillway of Hirakud 
				Dam,Odisha | 
            
        
    			Mrs. S.R. Patnaik, Mrs. V.P. Gadhe, Dr. M.R. Bhajantri AND 
				Dr. (Mrs.) V.V. Bhosekar | 
            
        
    			
				  | 
        
        
            | 
                59. | 
            
                Strengthening Masonry Dams By Means Of Downstream Backfills | 
            
        
    			P.Lignier and S.Delmas | 
            
        
    			
				  | 
        
        
            | 
                60. | 
            
                A granular Filter for the Rehabilitation of the Flood Defence at 
				Gameren | 
            
        
    			A.R. Koelewijn, U. Förster, B.J. van der Kolk, A. Noordam, 
				E. Rosenbrand and A. Bezuijen | 
            
        
    			
				  | 
        
        
            | 
                61. | 
            
                Mosul Dam Conclusions Post 3 Years Emergency Drilling and 
				Grouting | 
            
        
    			G. Hlepas,  V. Bateman, W. Empson and M. Sami | 
            
        
    			
				  | 
        
        
            | 
                62. | 
            
                The Toddbrook Reservoir Spillway Incident and Emergency Response | 
            
        
    			A L Warren and N Bennett | 
            
        
    			
				  | 
        
        
            | 
                63. | 
            
                Maneri Dam - Repair of Spillway and its Energy dissipater 
				severely damaged by rolling boulders during floods – Case study | 
            
        
    			Vinod K Verma, C.S.Mathur, Yogesh Nanasaheb Bhise and Hemant 
				Joshi | 
            
        
    			
				  | 
        
        
            | 
                64. | 
            
                Validation of In-Sar Technology To Control Deformation and 
				Movements in Concrete Dams | 
            
        
    			Dr. David Galán Martín | 
            
        
    			
				  | 
        
        
            | 
                65. | 
            
                Preliminary Analysis of Underwater Maintenance Technology to the 
				Water Cushion Pool of Xiluodu Hydropower Station | 
            
        
    			J.J.Tian, Y.P. Mao, B. XU, W. Ke and J.F. Wang | 
            
        
    			
				  | 
        
        
            | 
                66. | 
            
                Application of the Dam Underwater Repair Technology in China | 
            
        
    			Zhongwei Liu, Jinsheng Jia,  Aili Li and Zixuan Qiu | 
            
        
    			
				  | 
        
        
            | 
                67. | 
            
                Appraisal of Spillway Capacity and Storage Augmentation for Dam 
				Safety using Piano Key Weir and Fuse Plug for Climate Change 
				Effects | 
            
        
    			Nayan Sharma, Gottumukkala Subhash and Gopal Das Singhal | 
            
        
    			
				  | 
        
        
            | 
                68. | 
            
                Case history and lessons learned automated instrumentation 
				system 
				Mosul Dam, Iraq (2015-2017) | 
            
        
    			J.B. Hummert, PE and D.F. Cauble PhD, PE | 
            
        
    			
				  | 
        
        
            | 
                69. | 
            
                Local Defects in Asphalt Concrete Linings on The Embankments of 
				Pump Storage Schemes | 
            
        
    			V. Chmelař, M. Rudolfová, J. Říha and M. Špano | 
            
        
    			
				  | 
        
        
            | 
                70. | 
            
                Innovative Research Methodology in Evolving Design of Spillways 
				for 
				Himalayan H. E. projects | 
            
        
    			Prajakta P. Gadge, M. R. Bhajantri and V. V. Bhosekar | 
            
        
    			
				  | 
        
        
            | 
                71. | 
            
                Deployment of a Fibre Optic Leaks and Seepages Detection System 
				below a Waterproofing Geomembrane on Upper Bhavani Dam | 
            
        
    			C. Gu idoux, R. Beguin, P. Pinettes, J. Su bramanian, V. Su 
				bramanian, F. Tronel and J.R. Courivaud | 
            
        
    			
				  | 
        
        
            | 
                72. | 
            
                Jet Grouting for seepage control and ground improvement in 
				Sarrath dam : a reliable but demanding tool for dam 
				rehabilitation | 
            
        
    			N. H. Dhiab, M. Belaid, J. Côté and M. Bouassida | 
            
        
    			
				  | 
        
        
            | 
                73. | 
            
                Dams Auscultation Using Drones  | 
            
        
    			Rubén Sancho Gómez-Zurdo and Dr. David Galán Martín | 
            
        
    			
				  | 
        
        
            | 
                74. | 
            
                Retrofit of bottom outlet no. 1 at the Poiana Uzului dam, using 
				complex 
				underwater works | 
            
        
    			I.D. Asman, A. Abdulamit and V. Nechifor and B. Creanga | 
            
        
    			
				  | 
        
        
            | 
                75. | 
            
                DHARMA – Development of Software for the Effective Management of 
				Dam Asset and Health Data | 
            
        
    			P.N. Singh, Y.N. Bhise, T. Kenda ll, P.K. Majumdar , D.K. 
				Cha ubey, D. L Ollivier, and 
				C. Baillet | 
            
        
    			
				  | 
        
        
            | 
                76. | 
            
                Revamping of Vibrating Wire Instruments of the Existing DAM | 
            
        
    			P.D. Kamalasekaran and S.D. Ranade | 
            
        
    			
				  | 
        
        
            | 
                77. | 
            
                Development of plastic concrete for deep cut-off walls and study 
				on QC 
				testing | 
            
        
    			C.C. Maslak, H. Ibuk and K. Beckhaus | 
            
        
    			
				  | 
        
        
            | 
                78. | 
            
                Experiences In The Repair of More than 300 Dams with Full 
				Reservoir Level | 
            
        
    			A. Gonzalo | 
            
        
    			
				  | 
        
        
            | 
                79. | 
            
                Improving Dam Surveillance and Monitoring in Countries with Non- 
				Exis tent Legal and Regulatory Dam Safety Frameworks – A Case of    
				Isimba Hydropower Plant (Uganda) | 
            
        
    			G. Rwakafunjo, W. Manirakiza, M. Akurut, J. Sempewo, 
				M. Kayondo and H.E. Mutikanga. | 
            
        
    			
				  | 
        
        
            | 
                80. | 
            
                Numerical Simulation of A Stage Constructed Rockfill Dam on 
				Plastic 
				Clay Foundation | 
            
        
    			A. Jain, A.K. Verma An d R.K. Choudhary | 
            
        
    			
				  | 
        
        
            | 
                81. | 
            
                Upgradation of Steel TP Composites in Hydromechanical Components | 
            
        
    			Athappan Sundaram And C.Kannappan | 
            
        
    			
				  | 
        
        
            | 
                82. | 
            
                Under Water Diagnosis In Repair And Rehabilitation of Dams – 
				Case Study : The Sholayar Dam, Tamil Nadu, India | 
            
        
    			P. Sasikala and M.S. Indira Priyadarshini | 
            
        
    			
				  | 
        
        
            | 
                83. | 
            
                Indian experience in flexible geomembrane for watertightness of 
				ageing dams 
			 | 
            
        
    		Vinayagam Subramanian, Jagadeesan Subramanian, Alberto M Scuero and 
			Gabriella Vaschetti | 
            
        
    			
				  | 
        
        
            | 
                84. | 
            
                Upgrading Pikes Creek Dam Spillway with a Fusegate System(*)
			 | 
            
        	 
			Hasan T. KOCAHAN, Chad Hoover and Paul Schweiger 
			 | 
            
        
    			
				  |