| 
                S.No | 
            
                Paper Title | 
            
                Author's | 
            
                View/Download | 
        
        
            | 
                1. | 
            
                A Case Study of Effective Application of Innovative Management 
				Localization on RCC Dam Construction at Kafue Gorge Lower 
				Hydroelectric Project | 
            
                Yuanguang Liu, Haiting Yuan, Ya n Sh i and Xiaojun  Zhang | 
            
                
				  | 
        
        
            | 
                2. | 
            
                An innovative approach for construction of large adit through 
				River Borne Material at Vishnugad Pipalkoti Hydro Electric 
				Project (444MW), Uttarakhand, India | 
            
                D.V. Singh, R.K. Vishnoi, Gajendra Singh, Ajay Kumar, N.K.Ojha 
				And P. Vishwa karma | 
            
        
    			
				  | 
        
        
            | 
                3. | 
            
                Sensitive analysis for Assessment of Criticality of Abutment 
				Slopes Through Numerical Modelling - A Case Study Of Koteshwar 
				HEP , Uttarakhand, India | 
            
                R.K. Vishnoi, Gajendra Singh, K.C. Uniyal, Ajay Kumar And 
				Sandeep Rallan | 
            
        
    			
    			  | 
        
        
            | 
                4. | 
            
                Application of Rotec Belt Conveyor Equipment At Kafue Gorge 
				Lower Project | 
            
                Yuanguang Liu, Haitao yang, Kuihua Liu and Yan Shi | 
            
        
    			
				  | 
        
        
            | 
                5. | 
            
                Challenges in execution of Concrete Face Rock-Fill Dams In 
				Emerging Economies | 
            
                S.C. Mittal, Imran Sayeed, U.V. Hegde and Senthil Raja | 
            
        
    			
				  | 
        
        
            | 
                6. | 
            
                Construction Management System for Rock-Filled Concrete Dam | 
            
                Xiaorong Xu, Feng Jin and Hu Zhou | 
            
        
    			
				  | 
        
        
            | 
                7. | 
            
                Design and Security Analysis of High Asphalt Concrete Core 
				Rock-fill Dam | 
            
        	LIUSh ijia, DENG Yiguo, KONG Caifen, YANG Jian and LIU Haiyu | 
            
        
    			
				  | 
        
        
            | 
                8. | 
            
                The Use of Hydrophilic Waterstops in Dams Construction | 
            
                S. Taubert, P. Bu chanan and S. Fox | 
            
        
    			
				  | 
        
        
            | 
                9. | 
            
                Slope Stability of Hillock near Banda Branch Canal using GT S NX 
				Software - A Case Study | 
            
        	Dr. Sanjay A. Burele and Shri K. A. M. Bagwan | 
            
        
    			
				  | 
        
        
            | 
                10. | 
            
                Ranganadi Dam : A Success Story of Foolproof Planning and Speedy 
				Construction | 
            
                Rakesh Kumar Khali | 
            
        
    			
    			  | 
        
        
            | 
                11. | 
            
                Key Construction Technology of 300m High Core wall Rock-fill Dam | 
            
                Wu Gaojian, Fan Peng and Han Xing | 
            
        
    			
				  | 
        
        
            | 
                12. | 
            
                Construction of the Kishanganga Hydroelectric Project Concrete 
				Faced Rock Fill Dam, India | 
            
                A. Agarwal, M. Palmer and Y. Dadheech | 
            
        
    			
				  | 
        
        
            | 
                13. | 
            
                Construction of Borinquen Dam 1E at the Panama Canal | 
            
                Lelio 
				Mejia, James Toose and Jorge Fernandez | 
        
            
        
    			
				  | 
        
        
            | 
                14. | 
            
                Successful Application of RCC Interlayer Joint Bonding 
				Technology with Surface Long Time Exposed In Dry and High 
				Temperature Areas | 
            
        
    			Junjie Jin, Qingguo Zhou, Shuncai Ning and Yuanguang Liu | 
            
        
    			
				  | 
        
        
            | 
                15. | 
            
                Sustainable Development in the Construction of Concrete Dams in 
				India | 
            
        
    			Dr S C Maiti | 
            
        
    			
				  | 
        
        
            | 
                16. | 
            
                The introduction effects of 3D information models in 
				Koishiwaragawa Dam Construction Project | 
            
                T. Miyazaki, T. Yoshida | 
            
        
    			
				  | 
        
        
            | 
                17. | 
            
                Mid-course corrections in significant project parameters due to 
				extreme event of flash flood in Vishnugad Pipalkoti Hydro 
				Electric Project (444MW), Uttarakhand, India  | 
            
        
            	R.K. Vishnoi, Gajendra Singh, Ajay Kumar, N. K.Ojha and P. 
				Vishwakarma | 
            
        
    			
				  | 
        
        
            | 
                18. | 
            
                
				Energy-based Real-time Monitoring and Intelligent Evaluation of 
				Fresh Concrete Vibration Quality | 
            
        	
			Ce Bian | 
            
        
    			
				  | 
        
        
            | 
                19 | 
            
                
				Thermal control measures to enable rapid concrete placement at 
				the Yusufeli Dam | 
            
        	 
			Quentin  Shaw 
			 | 
            
        
    			
				  |